Next US LNG Export Plant Aims to Begin Production in Mid-2024

Next US LNG Export Plant Aims to Begin Production in Mid-2024

Venture Global LNG Inc. expects to begin production at its second liquefied natural gas export facility in Louisiana in mid-2024, further cementing to the US as the world’s biggest supplier of the super-chilled fuel.

Author of the article:

Published Apr 27, 2024  •  1 minute read

BW INTEGRITY (IMO: 9724946) a Floating Storage/Production at Fauji Oil Terminal & Distribution Co. Ltd., in Karachi, Pakistan, on Friday, June 24, 2022. Photographer: Asim Hafeez/Bloomberg Photo by Asim Hafeez /Bloomberg

(Bloomberg) — Venture Global LNG Inc. expects to begin production at its second liquefied natural gas export facility in Louisiana in mid-2024, further cementing to the US as the world’s biggest supplier of the super-chilled fuel.

The Arlington, Virgina-based company requested approval to receive an LNG shipment to cool down its equipment as part of its start-up process at the Plaquemines LNG facility, according to a regulatory filing dated April 22. That’s a key step before LNG exports can begin.

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O’Connor, Gabriel Friedman, Victoria Wells and others.
  • Daily content from Financial Times, the world’s leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles from Barbara Shecter, Joe O’Connor, Gabriel Friedman, Victoria Wells and others.
  • Daily content from Financial Times, the world’s leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

Sign In or Create an Account

or

Article content

Article content

The shale revolution has unlocked vast reserves of natural gas across the US, pushing the country to overtake Qatar and Australia as the top LNG exporter last year. US deliveries are slated to double by the end of the decade, as demand across Asia rapidly grows and Europe moves to replace Russian pipeline gas.

Plaquemines, which is currently under construction, this last week received some gas supply to its Louisiana pipeline Gator Express. The facility’s total planned capacity is 20 million tons per year, with the first phase to produce 10 million tons. 

In an import license request to the Department of Energy, Venture Global said the facility will need to import foreign-sourced LNG to the facility to cool down the plant for cryogenic operations and “may receive up to three LNG carriers.” The producer said that all of its Plaquemines imports would take place this year.

A spokesperson for Venture Global declined to comment on Saturday, referring to the filing. 

Venture Global would be the eighth US LNG export facility. Venture Global’s first facility — Calcasieu Pass  — began producing LNG in 2022, but isn’t expected to enter commercial operations until end-2024. That’s delayed the start of supply to its anchor customers at Calcasieu Pass, including Shell Plc., BP Plc., and Repsol SA, which have filed arbitration disputing that their contracts should have started sooner.

—With assistance from Stephen Stapczynski.

Article content

Read More

Leave a Reply

Your email address will not be published. Required fields are marked *