Modular builder axes senior executive

Modular builder axes senior executive

The very first wall produced by Eco Modular Buildings at its factory in Albania

Modular company Eco Buildings Group plc has actually revealed the sacking of its executive vice chairman Dominic Redfern “for cause”.

Redfern had actually been suspended given that 22 December in 2015 pending more examination by the business.

The choice to dismiss him “aligns with our dedication to maintaining the greatest requirements of conduct within our company”, Eco Buildings kept in mind in a declaration to the London Stock Exchange (LSE) on 18 January.

Building News approached Eco Buildings for additional remark.

In the very same declaration, the AIM-listed company revealed that its chairman was retiring. Andrew Allner was chairman of Fox Marble Holdings plc from 2011 up until that company obtained Eco Buildings Group in 2022 for ₤ 30m in a reverse takeover.

Other construction-related functions presently held by Allner consist of non-executive chairmanships of Shepherd Building Group plc and SIG plc.

Don Nicolson will prosper Allner at Eco Buildings. The 2 will collaborate on an interim basis up until a handover duration ends in late February.

The company explained Nicolson as a “senior magnate with 40 years’ experience in a series of sectors, both in the UK and globally”. His previous functions consisted of senior positions in a 26-year profession at BP.

Eco Buildings Group has a market capitalization of ₤ 9.98 m and has actually been noted on the LSE because August 2012.

Its main head offices remain in London and Eco Buildings has a production and licence arrangement in location with a UK-based domestic modular start-up called North Eco. Under the regards to the arrangement, Eco Buildings gets 30 percent of the gross invoices of each system offered by North Eco.

The company’s activities are mostly in the Balkans, particularly in Albania, where it has actually developed a 2,440 square metre making center in Dürres for its glass fibre-reinforced plaster items. The factory produced its very first wall (visualized) last December and Eco Buildings Group anticipates to get in major industrial production there in the very first quarter of this year.

Related short articles

Find out more

Leave a Reply

Your email address will not be published. Required fields are marked *